BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//ChamberMaster//Event Calendar 2.0//EN
METHOD:PUBLISH
X-PUBLISHED-TTL:P3D
REFRESH-INTERVAL:P3D
CALSCALE:GREGORIAN
BEGIN:VEVENT
DTSTART:20200313T140000Z
DTEND:20200313T230000Z
X-MICROSOFT-CDO-ALLDAYEVENT:FALSE
SUMMARY:Lean Unit 3: Workstructuring & Lean Unit 4: The Last Planner® System (03/13/20)
DESCRIPTION:Lean Units 3 & 4\n\n\n\nLean Unit 3: Lean Workstructuring is the first of two units that introduces the Last Planner  System (LPS). This system was developed by the Lean Construction Institute (LCI) to plan projects in a way that produces predictable workflow and rapid learning. This half-day\, instructor-led course describes the process of Lean Workstructuring. Following this course\, students will be able to: \n\n\n	Apply the methods and tools utilized in pull planning\n	Describe the concept of Lean Workstructuring\n	Outline the desired outcomes of Lean Workstructuring \n	Describe the characteristics and application of the Last Planner  System\n\n\nLean Unit 4: The Last Planner  System is the second of two units introducing the Last Planner  System (LPS). This system was developed by the Lean Construction Institute (LCI) to plan projects in a way that produces predictable workflow and rapid learning. This half-day\, facilitator-led course shows how to conduct make-ready and weekly work planning sessions. Following this course\, students will be able to: \n\n\n	Apply the Last Planner  System on a project\;\n	Hold make-ready and weekly work planning sessions\;\n	Calculate\, track and analyze percent plan complete for a project\n\nAbout the Lean Construction Education Program (LCEP)\n\nLean Construction is based on the holistic pursuit to optimize efficiency\, maximize value\, and minimize costs through all phases of a construction project: planning\, design\, construction\, activation\, operations\, maintenance\, salvaging\, and recycling.  Everyone related to the construction process has an incentive to get the project done faster and at a lower cost - from the project owners who want to see tangible results for their investment\, to the contractors and designers who want to do their job well and move on to the next project. \n\n\n\nAGC of America developed the 7-unit Lean Construction Education Program (LCEP) to help contractors develop the knowledge needed to build projects using Lean practices. Construction professionals at all experience levels will learn the building blocks necessary to transform their projects and companies into a Lean operating system.
X-ALT-DESC;FMTTYPE=text/html:<p style="outline: none\; margin: 0px 0px 20px\; color: rgb(37\, 37\, 37)\; font-family: Lato\, &quot\;Helvetica Neue&quot\;\, Helvetica\, Arial\, sans-serif\; font-size: 14px\; background-color: rgb(253\, 253\, 253)\;"><span style="font-size:14px\;"><span style="font-family:verdana\;"><strong><span style="color:#252525\;"><span style="font-size:16px\;">Lean Units 3 &amp\; 4</span><br />\n<br />\nLean Unit 3:&nbsp\;<em>Lean Workstructuring&nbsp\;</em></span></strong><span style="color:#252525\;">is the first of two units that introduces the Last Planner&reg\; System (LPS). This system was developed by the Lean Construction Institute (LCI) to plan projects in a way that produces predictable workflow and rapid learning. This half-day\, instructor-led course describes the process of Lean Workstructuring. Following this course\, students will be able to:</span>&nbsp\;</span></span></p>\n\n<ul>\n	<li style="background:#FDFDFD\;"><span style="font-size:14px\;"><span style="font-family:verdana\;"><span style="color:#252525\;">Apply the methods and tools utilized in pull planning</span></span></span></li>\n	<li style="background:#FDFDFD\;"><span style="font-size:14px\;"><span style="font-family:verdana\;"><span style="color:#252525\;">Describe the concept of Lean Workstructuring</span></span></span></li>\n	<li style="background:#FDFDFD\;"><span style="font-size:14px\;"><span style="font-family:verdana\;"><span style="color:#252525\;">Outline the desired outcomes of Lean Workstructuring&#8203\;</span></span></span></li>\n	<li style="background:#FDFDFD\;"><span style="font-size:14px\;"><span style="font-family:verdana\;"><span style="color:#252525\;"><span style="font-size:14px\;"><span style="font-family:verdana\;"><span style="color:#252525\;">Describe the characteristics and application of the Last Planner&reg\; System</span></span></span></span></span></span></li>\n</ul>\n\n<div style="background:#FDFDFD\;"><strong><span style="color:#252525\;"><span style="font-family:verdana\,sans-serif\;"><span style="font-size:10.5pt\;">Lean Unit 4:&nbsp\;<em>The Last Planner&reg\;&nbsp\;System&nbsp\;</em></span></span></span></strong><span style="color:#252525\;"><span style="font-family:verdana\,sans-serif\;"><span style="font-size:10.5pt\;">is the second of two units introducing the Last Planner&reg\; System (LPS). This system was developed by the Lean Construction Institute (LCI) to plan projects in a way that produces predictable workflow and rapid learning. This half-day\, facilitator-led course shows how to conduct make-ready and weekly work planning sessions. Following this course\, students will be able to:&nbsp\;</span></span></span>\n\n<ul>\n	<li style="color:#333333\;line-height:normal\;background:#FDFDFD\;"><span style="color:#252525\;"><span style="font-family:verdana\,sans-serif\;"><span style="font-size:10.5pt\;">Apply the&nbsp\;<span style="background:#FDFDFD\;">Last Planner&reg\; System</span>&nbsp\;on a project\;</span></span></span></li>\n	<li style="color:#333333\;line-height:normal\;background:#FDFDFD\;"><span style="color:#252525\;"><span style="font-family:verdana\,sans-serif\;"><span style="font-size:10.5pt\;">Hold make-ready and weekly work planning sessions\;</span></span></span></li>\n	<li style="color:#333333\;line-height:normal\;background:#FDFDFD\;"><span style="color:#252525\;"><span style="font-family:verdana\,sans-serif\;"><span style="font-size:10.5pt\;">Calculate\, track and analyze percent plan complete for a project</span></span></span></li>\n</ul>\n<strong><span style="color:#252525\;"><span style="font-family:helvetica\,sans-serif\;"><span style="font-size:10.5pt\;">About the Lean Construction Education Program (LCEP)</span></span></span></strong><br />\n<span style="background:#FDFDFD\;"><span style="color:#252525\;"><span style="font-family:verdana\,sans-serif\;"><span style="font-size:10.5pt\;">Lean Construction is based on the holistic pursuit to optimize efficiency\, maximize value\, and minimize costs through all phases of a construction project: planning\, design\, construction\, activation\, operations\, maintenance\, salvaging\, and recycling.&nbsp\;&nbsp\;Everyone related to the construction process has an incentive to get the project done faster and at a lower cost - from the project owners who want to see tangible results for their investment\, to the contractors and designers who want to do their job well and move on to the next project.&nbsp\;<br />\n<br />\nAGC&nbsp\;of America developed the 7-unit Lean Construction Education Program (LCEP) to help contractors develop the knowledge needed to build projects using Lean practices. Construction professionals at all experience levels will learn the building blocks necessary to transform their projects and companies into a Lean operating system.</span></span></span></span><br />\n&nbsp\;</div>\n
LOCATION:AGC Training Center 686 Mariposa Street Denver\, CO 80204
UID:e.9483.5939
SEQUENCE:3
DTSTAMP:20260501T212705Z
URL:http://agccolorado.memberzone.com/events/details/lean-unit-3-workstructuring-lean-unit-4-the-last-planner-system-03-13-20-5939
END:VEVENT

END:VCALENDAR
