BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//ChamberMaster//Event Calendar 2.0//EN
METHOD:PUBLISH
X-PUBLISHED-TTL:P3D
REFRESH-INTERVAL:P3D
CALSCALE:GREGORIAN
BEGIN:VEVENT
DTSTART:20191108T200000Z
DTEND:20191109T000000Z
X-MICROSOFT-CDO-ALLDAYEVENT:FALSE
SUMMARY:Lean Unit 4: The Last Planner® System (11/08/2019)
DESCRIPTION:Lean Unit 4: The Last Planner  System is the second of two units introducing the Last Planner  System (LPS). This system was developed by the Lean Construction Institute (LCI) to plan projects in a way that produces predictable workflow and rapid learning. This half-day\, facilitator-led course shows how to conduct make-ready and weekly work planning sessions. Following this course\, students will be able to: \n\n\n	Apply the Last Planner  System on a project\;\n	Hold make-ready and weekly work planning sessions\; \n	Calculate\, track and analyze percent plan complete for a project\n\n\nAbout the Lean Construction Education Program (LCEP)\n\nLean Construction is based on the holistic pursuit to optimize efficiency\, maximize value\, and minimize costs through all phases of a construction project: planning\, design\, construction\, activation\, operations\, maintenance\, salvaging\, and recycling.  Everyone related to the construction process has an incentive to get the project done faster and at a lower cost - from the project owners who want to see tangible results for their investment\, to the contractors and designers who want to do their job well and move on to the next project. \n\n\n\nAGC of America developed the 7-unit Lean Construction Education Program (LCEP) to help contractors develop the knowledge needed to build projects using Lean practices. Construction professionals at all experience levels will learn the building blocks necessary to transform their projects and companies into a Lean operating system.
X-ALT-DESC;FMTTYPE=text/html:<p style="outline: none\; margin: 0px 0px 20px\; color: rgb(37\, 37\, 37)\; font-family: Lato\, &quot\;Helvetica Neue&quot\;\, Helvetica\, Arial\, sans-serif\; font-size: 14px\; background-color: rgb(253\, 253\, 253)\;"><span style="font-size:14px\;"><span style="font-family:verdana\;"><strong><span style="color:#252525\;">Lean Unit 4:&nbsp\;<em>The Last Planner&reg\;&nbsp\;System&nbsp\;</em></span></strong><span style="color:#252525\;">is the second of two units introducing the Last Planner&reg\; System (LPS). This system was developed by the Lean Construction Institute (LCI) to plan projects in a way that produces predictable workflow and rapid learning. This half-day\, facilitator-led course shows how to conduct make-ready and weekly work planning sessions. Following this course\, students will be able to:</span>&nbsp\;</span></span></p>\n\n<ul>\n	<li style="background:#FDFDFD\;"><span style="font-size:14px\;"><span style="font-family:verdana\;"><span style="color:#252525\;">Apply the </span></span></span><span style="color: rgb(37\, 37\, 37)\; font-family: verdana\; font-size: 14px\; background-color: rgb(253\, 253\, 253)\;">Last Planner&reg\; System</span><span style="font-size:14px\;"><span style="font-family:verdana\;"><span style="color:#252525\;"> on a project\;</span></span></span></li>\n	<li style="background:#FDFDFD\;"><span style="font-size:14px\;"><span style="font-family:verdana\;"><span style="color:#252525\;">Hold make-ready and weekly work planning sessions\; </span></span></span></li>\n	<li style="background:#FDFDFD\;"><span style="font-size:14px\;"><span style="font-family:verdana\;"><span style="color:#252525\;">Calculate\, track and analyze percent plan complete for a project</span></span></span></li>\n</ul>\n\n<div style="background:#FDFDFD\;"><span style="font-size:14px\;"><span style="font-family:verdana\;"><strong style="color: rgb(37\, 37\, 37)\; font-family: Lato\, &quot\;Helvetica Neue&quot\;\, Helvetica\, Arial\, sans-serif\; outline: none\;">About the Lean Construction Education Program (LCEP)</strong><br />\n<span style="color: rgb(37\, 37\, 37)\; background-color: rgb(253\, 253\, 253)\;">Lean Construction is based on the holistic pursuit to optimize efficiency\, maximize value\, and minimize costs through all phases of a construction project: planning\, design\, construction\, activation\, operations\, maintenance\, salvaging\, and recycling.&nbsp\;&nbsp\;Everyone related to the construction process has an incentive to get the project done faster and at a lower cost - from the project owners who want to see tangible results for their investment\, to the contractors and designers who want to do their job well and move on to the next project.&nbsp\;<br />\n<br />\nAGC&nbsp\;of America developed the 7-unit Lean Construction Education Program (LCEP) to help contractors develop the knowledge needed to build projects using Lean practices. Construction professionals at all experience levels will learn the building blocks necessary to transform their projects and companies into a Lean operating system.</span></span></span></div>\n
LOCATION:AGC Training Center 686 Mariposa Street Denver\, CO 80204
UID:e.9483.5248
SEQUENCE:3
DTSTAMP:20260502T001832Z
URL:http://agccolorado.memberzone.com/events/details/lean-unit-4-the-last-planner-system-11-08-2019-5248
END:VEVENT

END:VCALENDAR
