Lean Unit 4: The Last Planner® System (11/08/2019)

Lean Unit 4: The Last Planner® System is the second of two units introducing the Last Planner® System (LPS). This system was developed by the Lean Construction Institute (LCI) to plan projects in a way that produces predictable workflow and rapid learning. This half-day, facilitator-led course shows how to conduct make-ready and weekly work planning sessions. Following this course, students will be able to: 

  • Apply the Last Planner® System on a project;
  • Hold make-ready and weekly work planning sessions;
  • Calculate, track and analyze percent plan complete for a project
About the Lean Construction Education Program (LCEP)
Lean Construction is based on the holistic pursuit to optimize efficiency, maximize value, and minimize costs through all phases of a construction project: planning, design, construction, activation, operations, maintenance, salvaging, and recycling.  Everyone related to the construction process has an incentive to get the project done faster and at a lower cost - from the project owners who want to see tangible results for their investment, to the contractors and designers who want to do their job well and move on to the next project. 

AGC of America developed the 7-unit Lean Construction Education Program (LCEP) to help contractors develop the knowledge needed to build projects using Lean practices. Construction professionals at all experience levels will learn the building blocks necessary to transform their projects and companies into a Lean operating system.

Lean Unit 4: The Last Planner® System...

Enter your email address below to receive a reminder message.

Please complete the Captcha

Date and Time

Friday Nov 8, 2019
1:00 PM - 5:00 PM MST

1pm - 5pm
 

Location

AGC Training Center
686 Mariposa Street
Denver, CO 80204

686 Mariposa Street Denver CO 80204

Fees/Admission

members $300
non-members $400

Contact Information

303.388.2422
Send Email

Enter your email address below to receive a reminder message.

Please complete the Captcha

Business Directory Events Calendar Member To Member Deals Contact Us
GrowthZone - Membership Management Software
Share
Print Email Add to Calendar Facebook Twitter LinkedIn
Tell a Friend
Select Calendar Type
Google Yahoo iCal (Outlook, Apple, or other)